Installation

ins1

STEP1:

One of our friendly dealers will come to site to evaluate positioning, access and pool requirements.

ins2

STEP2:

A Template of the pool shape is laid out on the ground to create the initial shape of the pool.

ins3

STEP3:

The measurements of the pool are checked and squared up relevant to houses or other surrounding structures.
Once we are happy with the pool positioning an excavator is ready to start digging the pool hole.

ins4

STEP4:

The pool hole is then dug and the excavated materials are removed from site.

5_production

STEP5:

The base material is then screaded to set heights for the pool to be placed into position.

6_production

STEP6:

The crane is then positioned and set up. In this case the crane was set up at the front of the house with the pool being lifted over the house roof.

7_production

STEP7:

The pool is then connected to the crane and the lift begins.

8_production

STEP8:

Swimming pool being lifted over the roof of the house.

9_production

STEP9:

The pool is then lowered down into position.

10_production

STEP10:

The pools final sitting position is measured and squared up before the crane leaves the site, levels at this stage are also checked.

11_production

STEP11:

Pipework, filters and lights are all connected and the process of back filling the water begins.

12_production

STEP12:

The concrete bond beam/slab are then prepared and poured awaiting pavers/tiles to finish off the pool.

13_production

STEP13:

The coping pavers/tiles are installed and your swimming pool water is balanced ready for swimming.